SBA Fees for Fiscal Year 2027: The 7(a) and 504 Fee Schedule, With Worked Examples

    By David Jones, MAI, CCIM. Published November 20, 2026.

    The FY2027 fee year in one paragraph

    SBA sets the fees on 7(a) and 504 loans one fiscal year at a time. The FY2027 schedule covers loans approved from October 1, 2026 through September 30, 2027. For 7(a) it comes from Information Notice 5000-881797, published September 3, 2026, which says: "The following fees are effective for all 7(a) loans approved on October 1, 2026, through and including September 30, 2027." For 504 it comes from Information Notice 5000-881796, published the same day. The 7(a) percentages did not move from FY2026. What moved is who gets a fee waiver, and the 504 annual service fee, which came down slightly.

    This post sets out both schedules, shows what changed, works three examples and explains where each fee belongs in the sources and uses of a feasibility study. To run your own loan amount, use the SBA fee calculator.

    The FY2027 7(a) upfront fee

    The 7(a) upfront fee is a percentage of the guaranteed portion of the loan, not of the whole loan. The size tier is set by the gross loan amount. The tiers and percentages for FY2027 are the same as in FY2026 (Information Notice 5000-872051, dated August 28, 2025).

    Gross loan amountFY2027 upfront feeFY2026 upfront fee
    $150,000 or less (maturity over 12 months)2% of the guaranteed portion; the lender may retain no more than 25% of the feeSame
    $150,001 to $700,0003% of the guaranteed portionSame
    $700,001 to $5,000,0003.5% of the guaranteed portion up to and including $1,000,000, plus 3.75% of the guaranteed portion over $1,000,000Same
    Maturity of 12 months or less (short-term loans)0.25% of the guaranteed portionSame

    The notice words the top tier this way: "3.5% of the guaranteed portion of the loan up to and including $1,000,000, plus 3.75% of the guaranteed portion over $1,000,000."

    Two points follow from the way the fee is built.

    First, the guaranty percentage decides the base. Under SOP 50 10 8.1, Appendix 16, the maximum guaranty percentage is "85% for loans of $150,000 or less" and "75% for loans over $150,000", and the maximum guaranty amount is $3,750,000. SBA Express loans carry a 50% guaranty, so the same percentage produces a smaller fee on an Express loan of the same size.

    Second, the schedule is a ceiling that SBA can reset each year. The SOP (Section A, Chapter 4, Paragraph C, 7(a) Loan Program Fees) carries the fee chart as a maximum, and SBA changes the fees by Information Notice for each fiscal year.

    The annual service fee, and who pays it

    The second 7(a) fee is the Lender's Annual Service Fee, also called the on-going guaranty fee. For FY2027 the notice says it "will be 0.55% of the outstanding balance of the guaranteed portion of each loan." That is the same rate as FY2026.

    The rule on who pays is short and absolute: "Lenders may not pass the Lender's Annual Service Fee on to the Borrower." The upfront fee is different. The SOP says: "The 7(a) Lender is permitted to pass the cost of the Upfront Fee to the Borrower." So a borrower should expect to see the upfront fee in the closing costs and should never see the annual service fee as a line item.

    FeeWho owes it to SBACan it be passed to the borrower?
    7(a) upfront feeThe lenderYes. The SOP permits the lender to pass the cost to the borrower
    7(a) Lender's Annual Service Fee (0.55%)The lenderNo. The FY2027 notice forbids it

    The lender still bears the annual fee as a cost of the loan, and a lender prices its loans knowing its costs. But the fee is not a borrower charge, and a projection that lists it as a borrower expense is wrong.

    What changed in the 7(a) waivers

    This is where FY2027 differs from FY2026.

    In FY2026 the waiver was for manufacturers only. The FY2026 notice said: "For loans to manufacturers (NAICS sectors 31-33) of $950,000 or less, the upfront fee is 0% (does not apply to MARC loans)."

    In FY2027 the waiver is narrower in size and wider in reach. The upfront fee is 0% for loans of $700,000 or less to three groups: manufacturers (NAICS sectors 31-33), businesses in the food supply chain NAICS codes that the notice lists, and businesses located in a rural area. In the notice's words: "For loans of $700,000 or less, to manufacturers (NAICS sectors 31-33), food supply chain" codes "and businesses that are located in a rural area, the Upfront fee is 0%."

    WaiverFY2026FY2027
    Loan size covered$950,000 or less$700,000 or less
    Manufacturers (NAICS sectors 31-33)YesYes
    Listed food supply chain codesNoYes
    Businesses located in a rural areaNoYes

    Three consequences are worth stating plainly.

    SBA's loan data gives a sense of how many projects sit under the new ceiling. Across FY2010 to FY2026 approvals, the average 7(a) loan was $561,285 in manufacturing, $415,964 in food manufacturing (excluding meat), $600,947 in meat and poultry processing and $605,737 in wood product manufacturing. All four averages are below $700,000. An average is not a distribution, and many individual loans are larger, but the typical manufacturing loan is inside the FY2027 waiver. The breakdown for 20 project types is on SBA lending by project type.

    The SBA Express veteran fee

    The FY2027 notice keeps a separate rule for veterans: "For all SBA Express loans made to businesses owned and controlled by a veteran or spouse of a veteran, the Upfront Fee will be $0". The lender must document the eligibility. The rule applies to every SBA Express loan, up to the $500,000 Express maximum.

    The 90-day rule

    The notice also clarifies the 90-day rule. Where two or more 7(a) loans with maturities over 12 months are approved within 90 days of each other, "the loans are considered as one loan for the purpose of determining the percentage of guaranty and the Upfront Fee calculation." Splitting a request into two smaller loans approved close together does not move it into a lower fee tier. The annual service fee is set loan by loan and is not aggregated.

    The FY2027 504 fees

    A 504 project has three funding parts: a third party lender's first lien loan, a CDC debenture guaranteed by SBA, and the borrower's contribution. The yearly fee notice deals with the debenture.

    504 feeFY2027FY2026
    SBA upfront guaranty fee0.50%0.50%
    Annual service fee0.203% of the outstanding balance of the loan0.209%
    Annual service fee, 504 Debt Refinance without Expansion0.204%0.2115%
    Waiver of the upfront and annual feesManufacturers (NAICS sectors 31-33), listed food supply chain codes and businesses located in a rural areaManufacturers (NAICS sectors 31-33) only

    The FY2027 notice says: "The upfront guaranty fee will be 0.50% (50 basis points)." and "The annual service fee will be 0.203% (20.3 basis points) of the outstanding balance of the loan." For the refinance option without expansion it adds a small increment: "0.203% plus 0.001%, for a total of 0.204%". The FY2026 notice (Information Notice 5000-871532) had set the annual fee at 0.209%.

    The 504 waiver was widened in the same way as the 7(a) waiver. For the three groups, "the upfront guaranty fee and the annual service fee will be waived", including loans under both debt refinance options. The 504 waiver text we read states no loan size ceiling, where the 7(a) waiver stops at $700,000.

    The yearly notice is not the whole 504 fee picture. SOP 50 10 8.1 (Section A, Chapter 4, Paragraph E, 504 Loan Program Fees) carries standing fees that do not change with the fiscal year:

    At application, "the CDC may require a deposit from the Borrower of $2,500 or 1% of the Net Debenture Proceeds, whichever is less."

    Worked examples

    The three examples below use the FY2027 schedule. Rates and amortization are illustrations only, not quotes.

    A $2,000,000 7(a) loan

    LineAmount
    Loan amount$2,000,000
    Guaranty (75% of loans over $150,000)$1,500,000
    FY2027 upfront fee (3.5% of the guaranteed portion up to $1,000,000 plus 3.75% above)$53,750
    Lender's annual service fee, year one (0.55% of the guaranteed portion; not passed to the borrower)$8,250
    Annual debt service at 10.5% fixed over 25 years (illustration only)$226,604
    Cash flow needed for debt service coverage of 1.15$260,594
    Cash flow needed for debt service coverage of 1.25$283,255

    The upfront fee of $53,750 is the borrower's cost if the lender passes it on. The $8,250 is the lender's.

    A $6,000,000 504 project

    LineAmount
    Total project cost$6,000,000
    Third party lender, first lien (50%)$3,000,000
    CDC debenture (30% for a new business on a special purpose property)$1,800,000
    Borrower contribution (20%: new business and special purpose)$1,200,000
    FY2027 SBA upfront guaranty fee (0.50% of the debenture)$9,000
    FY2027 annual service fee, year one (0.203% of the debenture balance)$3,654
    Annual debt service, both liens (first lien 10.5% over 25 years; debenture 6.5% over 25 years; illustration only)$485,750
    Cash flow needed for debt service coverage of 1.15$558,613

    The same project for an existing business on a general purpose property would carry a debenture of 40% and a contribution of 10%: a $2,400,000 debenture and a $600,000 contribution. The fee percentages are the same, but they apply to a larger debenture.

    A $500,000 SBA Express loan

    LineAmount
    Maximum SBA Express loan$500,000
    Guaranty (50%)$250,000
    FY2027 upfront fee (3% of the guaranteed portion, $150,001 to $700,000 tier)$7,500
    Upfront fee if veteran owned and controlled (FY2027)$0
    Annual debt service at 11.5% over 10 years (illustration only)$84,357
    Cash flow at 1.10 coverage, shown for comparison only$92,793

    The 1.10 figure in the last line is the 7(a) Small projection standard. The SOP sets no ratio for SBA Express, so the line is a comparison, not a test.

    How fees enter a feasibility study

    A fee matters to a study in two places: the sources and uses table, and the debt service coverage ratio (DSCR).

    Sources and uses. Every dollar a project needs has to appear as a use, and every use has to be matched by a source. An upfront fee the lender passes on is a real cost of the project. If the budget leaves it out, the project is underfunded by that amount on closing day, and the gap comes out of working capital. In the 7(a) example above that is $53,750. In a study we list the fee on its own line, state the fiscal year and the notice it comes from, and state the assumption about who bears it. On a 504 project the standing CDC and debenture fees belong in the same table.

    The right year. Fees follow the approval date, not the date the study is written. A project studied in the summer of 2026 and approved after October 1, 2026 falls under FY2027. A manufacturer's loan between $700,001 and $950,000 is the clearest case: the budget is different on either side of that date.

    Waivers as assumptions. A waiver that depends on a NAICS code or on a rural location is an assumption until the lender confirms it. A careful study shows the fee both ways where the difference is material, so the lender is not surprised.

    DSCR. The annual 7(a) service fee is the lender's cost and does not belong in the borrower's operating expenses. The 504 fees the borrower does pay over time, such as the CDC servicing fee, need to be reflected in what the borrower pays each year. Whichever way a fee is financed, the test is the same: the projected cash flow must cover the debt service of every loan in the structure. How we build and test that ratio is set out in financial projections and DSCR.

    For a view of what the 7(a) upfront fee costs across loan sizes, see the 7(a) guarantee fee cost analysis. The program pages cover the wider rules: 7(a) feasibility studies, 504 feasibility studies and SBA Express feasibility studies. The SOP provisions quoted here are collected on our SOP 50 10 8.1 page, and the firm's work as SBA feasibility study consultants is described on the homepage.

    Sources

    1) U.S. Small Business Administration, Information Notice 5000-881797, "7(a) Fees Effective October 1, 2026 for Fiscal Year 2027 and 90-Day Rule Clarification", published September 3, 2026. https://legacy.sba.gov/document/information-notice-5000-881797-fy-2027-7a-program-fees

    2) U.S. Small Business Administration, Information Notice 5000-881796, "504 Fees for Fiscal Year 2027", published September 3, 2026. https://legacy.sba.gov/document/information-notice-5000-881796-fy-2027-504-program-fees

    3) U.S. Small Business Administration, Information Notice 5000-872051, "7(a) Fees Effective October 1, 2025 for Fiscal Year 2026 and 90-Day Rule Clarification", dated August 28, 2025. https://www.sba.gov/document/information-notice-5000-872051-7a-fees-effective-october-1-2025-fiscal-year-2026

    4) U.S. Small Business Administration, SOP 50 10 8.1, "Lender and Development Company Loan Programs", published September 25, 2026, effective October 1, 2026. https://legacy.sba.gov/document/sop-50-10-lender-development-company-loan-programs

    5) U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 September 2026 (project state; disbursed loans only). Computed by the firm.

    6) U.S. Small Business Administration, Information Notice 5000-871532, "504 Fees for Fiscal Year 2026", effective August 28, 2025. https://www.sba.gov/document/information-notice-5000-871532-504-fees-fiscal-year-2026

    Questions

    What is the SBA 7(a) guaranty fee for FY2027?

    For loans approved October 1, 2026 through September 30, 2027, the upfront fee is 2% of the guaranteed portion for loans of $150,000 or less, 3% for loans of $150,001 to $700,000, and for loans of $700,001 to $5,000,000 it is 3.5% of the guaranteed portion up to and including $1,000,000 plus 3.75% of the guaranteed portion over $1,000,000. Short-term loans with a maturity of 12 months or less pay 0.25%. The source is SBA Information Notice 5000-881797.

    Did the 7(a) fees change from FY2026 to FY2027?

    The tiers and percentages did not change, and the Lender's Annual Service Fee stayed at 0.55%. The waiver changed. In FY2026 manufacturers paid a 0% upfront fee on loans of $950,000 or less. In FY2027 the 0% upfront fee applies to loans of $700,000 or less, and it covers manufacturers, listed food supply chain NAICS codes and businesses located in a rural area. A manufacturer's loan from $700,001 to $950,000 lost the waiver.

    Who pays the SBA annual service fee on a 7(a) loan?

    The lender pays it, and the lender may not charge it to the borrower. The FY2027 notice says the Lender's Annual Service Fee is 0.55% of the outstanding balance of the guaranteed portion of each loan, and that lenders may not pass it on to the borrower. The upfront fee is treated differently: SOP 50 10 8.1 permits the lender to pass the cost of the upfront fee to the borrower, so it normally appears in the borrower's closing costs.

    What are the SBA 504 fees for FY2027?

    The SBA upfront guaranty fee is 0.50% and the annual service fee is 0.203% of the outstanding balance of the loan, down from 0.209% in FY2026. For the 504 Debt Refinance without Expansion option the annual fee is 0.204%. Both fees are waived for manufacturers, listed food supply chain codes and businesses located in a rural area. Standing fees in the SOP, such as the CDC processing fee of up to 1.5% of the Net Debenture, apply as well.

    Do veterans pay an SBA Express upfront fee in FY2027?

    No. The FY2027 notice states that for all SBA Express loans made to businesses owned and controlled by a veteran or the spouse of a veteran, the upfront fee will be $0. The lender must document that the business qualifies. The rule is specific to SBA Express, which has a maximum loan of $500,000 and a 50% guaranty. On a $500,000 Express loan the standard FY2027 upfront fee would otherwise be $7,500.

    How much is the upfront fee on a $2,000,000 7(a) loan?

    Under the FY2027 schedule the upfront fee is $53,750. The loan carries a 75% guaranty, so the guaranteed portion is $1,500,000, and the fee is 3.5% of the guaranteed portion up to $1,000,000 plus 3.75% of the guaranteed portion above that. The lender's annual service fee in year one is $8,250, which is 0.55% of the guaranteed portion, and that fee is not passed to the borrower.

    Where do SBA fees go in a feasibility study?

    In the sources and uses table and, where the borrower pays a fee over time, in the cash flow that supports the debt service coverage ratio. An upfront fee the lender passes on is a project cost and needs its own line, with the fiscal year and notice stated. A waiver that depends on a NAICS code or a rural location is an assumption until the lender confirms it. The 7(a) annual service fee is the lender's cost and is not a borrower expense.

    Can two smaller 7(a) loans avoid the higher fee tier?

    Not if they are approved close together. The FY2027 notice restates the 90-day rule: where 7(a) loans with maturities over 12 months are approved within 90 days of each other, the loans are considered as one loan for the purpose of determining the percentage of guaranty and the upfront fee. The annual service fee is different. It is set for each loan separately and is not aggregated.